30.7 Period Management

Period Management includes settings for the report data time range, report generation time, and whether to perform pre-statistics.

By clicking Reports → Period Management, administrators can customize the periods for periodic reports.

Default periods include standard yearly, quarterly, monthly, weekly, and daily cycles. System default periods can be modified but not deleted. Selecting any period and clicking the restore button will restore it to the standard settings for that period type.

The settings for each period are described as follows:

Setting Description
Report Data Time Range The start and end dates of the data to be included in the report.
Report Generation Time The time when the periodic report is generated; statistics for the specified data time range will be generated at this time.
Pre-Statistics Before Report Generation When checked, and with a start time and interval set, the system will pre-calculate statistics from the start time. Once the interval duration is reached, the statistics for that period will be pre-generated.

Example for Pre-Statistics Before Report Generation

Suppose a monthly print statistics report is created with the following month-cycle settings:

  • Start Date: 1st of the month
  • End Date: 31st of the month
  • Report Generation Time: 31st of the month at 23:59

Using October as an example:

If Pre-Statistics Before Report Generation is not enabled, the report will generate October’s print statistics only on October 31 at 23:59. Before this time, October will not appear as an available selection in the report date picker.

To allow the administrator to view up-to-date statistics throughout October:

  • 1. Enable Pre-Statistics Before Report Generation.
  • 2. Set a Start Time for pre-statistics, e.g., October 7.
  • 3. Set the Statistical Interval to 1 week.

With this setup:

  • On October 7, the system will generate statistics from October 1 to October 7.
  • One week later (October 14), it will generate updated statistics from October 1 to October 14.
  • Each new pre-statistics result overwrites the previous one until the final report is generated on October 31.

This ensures that each pre-generated dataset increasingly approximates the final report results, allowing administrators to view near-real-time statistics during the month.

Note

For reports configured to send emails in the mail settings, only the final report generated at the scheduled report generation time will be sent. Pre-statistics generated during the period will not trigger email delivery.