A timeline, not a to-do list
Items are grouped T-30, T-14, T-7, T-0, T+1 and T+30, so the work starts at notice of intent rather than on the last day.
42 items on a T-30 to T+30 timeline, each with an owner, a due date, a risk level and a control reference. Excel with live completion tracking built in.
EXCEL
Editable Excel checklistReady after form submission
A checklist you fill in rather than read. Every row carries an owner, a target date, a status dropdown, a risk level and the control it satisfies.
Items are grouped T-30, T-14, T-7, T-0, T+1 and T+30, so the work starts at notice of intent rather than on the last day.
Status is a dropdown, the colour follows the selection, and the completion count at the top of the sheet updates as you go.
A separate 15-item sheet for contractors, agencies and outsourced teams, whose exits rarely pass through the HR process at all.
Departure risk concentrates in the weeks before anyone is told. This checklist front-loads the observation phase, then works through access reduction, asset recovery and evidence preservation in the order that keeps each step possible — you cannot pull a file trail from a device that has already been wiped and reissued.
The indicators that fire before someone leaves, the programme that automates these steps, and the product page that enforces them.